which of the following accurately describes a pert chart?\ngraphic with numbered circles or rectangles…

which of the following accurately describes a pert chart?\ngraphic with numbered circles or rectangles linked by arrowed lines\nelectronic organizer with lists of tasks, calendar and other sections\nillustration with list of tasks and a bar representing each task\nvisual display demonstrating the relationship among tasks

which of the following accurately describes a pert chart?\ngraphic with numbered circles or rectangles linked by arrowed lines\nelectronic organizer with lists of tasks, calendar and other sections\nillustration with list of tasks and a bar representing each task\nvisual display demonstrating the relationship among tasks

Answer

Brief Explanations:

A PERT (Program Evaluation and Review Technique) chart is a visual - display that shows the relationships among tasks in a project. It uses nodes (numbered circles or rectangles) and arrows to represent tasks and their dependencies. The first option is a partial description. The second option describes an electronic organizer, not a PERT chart. The third option describes a Gantt chart. The fourth option accurately sums up the main characteristic of a PERT chart.

Answer:

D. Visual display demonstrating the relationship among tasks