a packaging employee making $22 per hour can package 40 items during that hour. the direct material cost is…

a packaging employee making $22 per hour can package 40 items during that hour. the direct material cost is $0.56 per item. what is the total direct cost of 1 item?\n$?\nround to the nearest thousandth.
Answer
Explanation:
Step1: Calculate labor cost per item
The employee makes $22 per hour and can package 40 items per hour. So the labor - cost per item is $\frac{22}{40}$. $22\div40 = 0.55$
Step2: Calculate total direct cost per item
The direct - material cost per item is $0.56$. The total direct cost per item is the sum of the labor cost per item and the direct - material cost per item. $0.55 + 0.56=1.110$
Answer:
$1.110$