question 39 (1 point)\nan electronic gadgets store requires the following minimum number of employees, each…

question 39 (1 point)\nan electronic gadgets store requires the following minimum number of employees, each of whom is required to have two consecutive days off.\n|day|mon.|tue.|wed.|thur.|fri.|sat.|sun.|\n|----|----|----|----|----|----|----|----|\n|minimum employees required|9|2|8|6|9|1|3|\nif there are no day offs provided on thursday and friday, the number of employees required to work on thursday as per the final employee schedule is ______.\n9\n10\n11\n12\nquestion 40 (1 point)\na new surgical facility called cut & sew has opened in the united states. the branches of the facility are spread throughout the country. these are job shops that handle a variety of outpatient surgical procedures. the process of the facility is set up in a way that one doctor will cut and another will sew. the data regarding the patients and the estimated time for cutting and sewing for each patient are given in the following table:\n|patient|cut time (hours)|sew time (hours)|\n|----|----|----|\n|a|2.3|2.8|\n|b|2.5|3.0|\n|c|2.0|1.5|\n|d|0.6|1.0|\n|e|3.6|2.6|\nusing johnsons sequencing rule, the final sequence of the patients is ______.\na-b-c-d-e\nb-e-a-c-d\nc-a-b-e-d\nd-a-b-e-c
Answer
Question 39
Explanation:
Step1: Identify the given condition
No day - offs on Thursday and Friday.
Step2: Determine the number of employees required on Thursday
The minimum number of employees required on Thursday as given in the table is 6. But since there are no day - offs on Thursday and Friday, we need to consider the employees who would have had their off - days overlapping with these days. Looking at the overall schedule requirements, we note that the maximum number of employees required on either Thursday or Friday is 9. So, the number of employees required to work on Thursday is 9.
Answer:
9
Question 40
Explanation:
Johnson's sequencing rule is used for two - machine, n - job sequencing problems to minimize the total processing time. We need to find the minimum cutting or sewing time among all jobs. For job D, the cutting time is 0.6 which is the minimum. So, job D is placed first. Then we look for the next minimum time. The next minimum time is 1.0 (sewing time of job D). After that, we continue this process of picking the minimum time (either cutting or sewing) from the remaining jobs. The correct sequence using Johnson's rule is C - A - B - E - D.
Answer:
C. C - A - B - E - D