project apollo presented many engineering problems. when finding a good solution to a problem, engineers must identify and work within a set of constraints. constraints are things that limit the possible solutions to a problem.\nproject apollo had three key constraints: time, safety, and cost. president kennedy set 1970 as the target deadline for landing a person on the moon. he also specified that the astronauts must return safely to earth. the project had a budget that specified how much money could be spent. solutions to any of the project apollo problems had to work within these constraints.\nin engineering problems, some constraints may be prioritized, or treated as more important than other constraints. for project apollo, time and safety were prioritized over cost.\nclick the blue words to correct the following sentences.\nboth safety and cost were requirements that had to be met, so these constraints were a lower priority than other constraints. because engineers working on project apollo prioritized the constraints in this way, their solutions to problems often cost more than planned.

Answer

# Brief Explanations: The text states that for Project Apollo, time and safety were prioritized over cost. So the first sentence is incorrect as it implies safety and cost were of lower - priority compared to other unspecified constraints. The second sentence is correct as prioritizing time and safety over cost would likely lead to higher - than - planned costs. # Answer: The first sentence "Both safety and cost were requirements that had to be met, so these constraints were a lower priority than other constraints." is incorrect. The second sentence "Because engineers working on Project Apollo prioritized the constraints in this way, their solutions to problems often cost more than planned." is correct.