which of the following is considered good practice when building cutout stringers? use a lumber crayon to…

which of the following is considered good practice when building cutout stringers? use a lumber crayon to mark the rise and run select the material and match the crowns work with a speed square to mark out the rise and run
Answer
Answer:
All of the above are considered good practices. A. use a lumber crayon to mark the rise and run B. select the material and match the crowns C. work with a speed square to mark out the rise and run
Brief Explanations:
Marking rise - run accurately (using crayon or speed - square) is crucial for proper stringer construction. Selecting the right material and matching crowns ensures structural integrity and proper fit.