which installation method is most preferred when hanging drywall?\nupper wall, lower wall, then…

which installation method is most preferred when hanging drywall?\nupper wall, lower wall, then ceiling.\nceiling first, upper wall, lower wall.\nlower wall, upper wall, then ceiling.\nlower wall, then ceiling, upper wall.
Answer
Brief Explanations:
When hanging dry - wall, it is best to start with the ceiling first to avoid damaging the already - installed wall dry - wall. After the ceiling, the upper wall is installed, and then the lower wall. This order helps in better alignment and reduces the chance of errors and damage.
Answer:
Ceiling first, upper wall, lower wall.