which two measurements are criteria for evaluating their design?\n□ the length of string used\n□ the number…

which two measurements are criteria for evaluating their design?\n□ the length of string used\n□ the number of materials left over\n□ the number of metal washers used\n□ the number of ping - pong balls in the tram\n□ the time for the tram to travel down the string

which two measurements are criteria for evaluating their design?\n□ the length of string used\n□ the number of materials left over\n□ the number of metal washers used\n□ the number of ping - pong balls in the tram\n□ the time for the tram to travel down the string

Answer

Answer:

  • the length of string used
  • the time for the tram to travel down the string

Brief Explanations:

The length of string used can relate to design - efficiency and resource - usage. The time for the tram to travel down the string is a performance - related measure for the design.