using the illustration: when testing the fuses connect the red test lead terminal into which meter terminal…

using the illustration: when testing the fuses connect the red test lead terminal into which meter terminal? (this is referring to the test lead terminal end, not the probing end).\nterminal 1\nterminal 2\nterminal 3\nterminal 4
Answer
Brief Explanations:
When testing fuses with a multimeter, the red test - lead is typically connected to the terminal for resistance measurement. Terminal 4 is labeled with "VΩ Hz", which indicates it is used for voltage, resistance, and frequency measurements.
Answer:
D. Terminal 4