QUESTION IMAGE
Question
date
cell phone graph
cost (y-axis: $0, $0.10, $0.20, $0.30, $0.40, $0.50, $0.60, $0.70, $0.80, $0.90, $1.00, $1.10, $1.20)
minutes (x-axis: 0,1,2,3,4,5,6,7,8,9,10)
(plotted points at various (x,y) coordinates)
Since the problem (e.g., finding the slope, equation of the line, or cost per minute) isn't specified, let's assume we need to find the cost per minute (slope) from the graph.
Step1: Identify two points
Take (1, $0.05$) and (2, $0.15$) (approx from the graph, or more accurately, (1, $0.05$) and (10, $0.70$)). Let's use (0, 0) and (10, $0.70$) for simplicity (since at 0 minutes, cost is $0$).
Step2: Calculate slope (cost per minute)
Slope $m = \frac{y_2 - y_1}{x_2 - x_1} = \frac{0.70 - 0}{10 - 0} = 0.07$ dollars per minute.
Snap & solve any problem in the app
Get step-by-step solutions on Sovi AI
Photo-based solutions with guided steps
Explore more problems and detailed explanations
The cost per minute is $\$0.07$ (or adjust based on exact points; this is a sample calculation).