9. who is responsible for compliance with stormwater permit requirement…

Question

  1. who is responsible for compliance with stormwater permit requirements on a construction site?

source: https://www.epa.gov/npdes/stormwater-discharges-construction-activities
student response:

part b — clean water act overview (epa summary of the clean water act)

  1. what is the main goal of the clean water act (cwa)?

source: https://www.epa.gov/laws-regulations/summary-clean-water-act
student response:

  1. which year was the clean water act originally enacted, and what major problems did it aim to address?

source: https://www.epa.gov/laws-regulations/summary-clean-water-act
student response:

  1. describe what \point source\ pollution means under the cwa and give two

Explanation:

Response
Question 9
Brief Explanations

To determine who is responsible for stormwater permit compliance on a construction site, we refer to EPA guidelines. The construction site operator (or the person in charge of the construction activity, like the contractor or project manager) is responsible, as they oversee site operations and must implement stormwater pollution prevention measures.

Brief Explanations

The Clean Water Act (CWA)’s main goal is to restore and maintain the chemical, physical, and biological integrity of the nation’s waters. This includes reducing water pollution, protecting water quality for uses like drinking, recreation, and supporting aquatic life, and regulating discharges of pollutants into waters of the United States.

Brief Explanations

The Clean Water Act was originally enacted in 1972 (it built on earlier legislation like the Federal Water Pollution Control Act of 1948, but the 1972 amendments established its modern form). It aimed to address major problems like widespread water pollution (from industrial, municipal, and agricultural sources), degraded water quality harming human health and aquatic ecosystems, and lack of comprehensive regulation of pollutant discharges into surface waters.

Answer:

The person (or entity) in charge of the construction site (e.g., the construction site operator, contractor, or project manager) is responsible for compliance with stormwater permit requirements on a construction site.

Question 10