Question
a contractor uses this table to calculate the cost of paving rectangular site b. here is the contractor’s work: 60 ft × 40 ft × $6 per sq ft = $14,400 a project manager reviews the contractor’s work. at which step will the project manager find an error? a) checking the work against the data for recording errors. b) checking that the correct formula was used for this situation and the order of operations was followed. c) checking the work for calculation errors. d) the contractor’s work is correct. | site | length | width | fencing cost | paving cost | |---|---|---|---|---| | site a | 50 ft | 20 ft | $5 per ft | $9 per sq ft | | site b | 60 ft | 40 ft | $6 per ft | $8 per sq ft |
Step1: Verify paving cost rate
From the table, Site B's paving cost is $\$8$ per sq ft, not $\$6$ per sq ft.
Step2: Check contractor's formula use
The contractor used the wrong rate and miscalculated. The error is in formula/rate selection.
Step3: Evaluate review steps
The error stems from using incorrect data (wrong paving rate) and misapplying the cost formula, so checking formula/rate use will find it.
Snap & solve any problem in the app
Get step-by-step solutions on Sovi AI
Photo-based solutions with guided steps
Explore more problems and detailed explanations
B) Checking that the correct formula was used for this situation and the order of operations was followed.