QUESTION IMAGE
Question
company ships construction materials from three wood - processing plants to three retail stores. the shipping cost, monthly production capacities, and monthly demand for framing lumber are given below. formulate a linear optimization model for this problem, implement your model on a spreadsheet, and use excel solver to find a solution that minimizes total distribution costs. if the constant is equal to one, enter \1\. let: x11 = number of components produced in plant 1 and supplied to store a; x12 = number of components produced in plant 1 and supplied to store b; x13 = number of components produced in plant 1 and supplied to store c; x21 = number of components produced in plant 2 and supplied to store a; x22 = number of components produced in plant 2 and supplied to store b; x23 = number of components produced in plant 2 and supplied to store c; x31 = number of components produced in plant 3 and supplied to store a; x32 = number of components produced in plant 3 and supplied to store b; x33 = number of components produced in plant 3 and supplied to store c. min objective function. subject to the constraints: constraints with variables ≥ 0. what is the value of total distribution costs at the optimal solution? use the excel solver to find the optimal solution. round your answer to the nearest dollar. table: plant (1,2,3), store a costs: $7.30, $4.60, $8.10; store b: $6.80, $9.00, $8.20; store c: $6.10, $8.30, $5.80; capacity: 510, 290, 320; demand: 190, 400, 470.
To solve this linear optimization (transportation) problem, we first define the objective function and constraints, then use Excel Solver. Here's the breakdown:
Step 1: Define Variables
Let \( x_{ij} \) = number of components shipped from Plant \( i \) to Store \( j \), where \( i = 1,2,3 \) (plants) and \( j = 1,2,3 \) (stores: A, B, C).
Step 2: Objective Function (Minimize Cost)
Shipping costs (per unit) are:
- Plant 1: Store A (\$7.30), Store B (\$6.80), Store C (\$6.10)
- Plant 2: Store A (\$4.60), Store B (\$9.00), Store C (\$8.30)
- Plant 3: Store A (\$8.10), Store B (\$8.20), Store C (\$5.80)
Total cost \( Z \) is:
\[
Z = 7.30x_{11} + 6.80x_{12} + 6.10x_{13} + 4.60x_{21} + 9.00x_{22} + 8.30x_{23} + 8.10x_{31} + 8.20x_{32} + 5.80x_{33}
\]
Step 3: Constraints
Supply (Plant Capacity):
- Plant 1: \( x_{11} + x_{12} + x_{13} \leq 510 \)
- Plant 2: \( x_{21} + x_{22} + x_{23} \leq 290 \)
- Plant 3: \( x_{31} + x_{32} + x_{33} \leq 320 \)
Demand (Store Requirement):
- Store A: \( x_{11} + x_{21} + x_{31} = 190 \)
- Store B: \( x_{12} + x_{22} + x_{32} = 400 \)
- Store C: \( x_{13} + x_{23} + x_{33} = 470 \)
Non-negativity:
\( x_{ij} \geq 0 \) for all \( i,j \).
Step 4: Solve with Excel Solver
- Set Up Spreadsheet:
- Create a table for \( x_{ij} \) (decision variables).
- Calculate total cost using the objective function.
- Define supply/demand constraints.
- Run Solver:
- Objective: Minimize total cost.
- Variables: \( x_{ij} \) cells.
- Constraints: Supply (≤ capacity), Demand (= requirement), Non-negativity.
Step 5: Optimal Solution (From Solver)
After solving, the optimal shipping quantities and total cost are:
| Plant → Store | \( x_{11} \) | \( x_{12} \) | \( x_{13} \) | \( x_{21} \) | \( x_{22} \) | \( x_{23} \) | \( x_{31} \) | \( x_{32} \) | \( x_{33} \) |
|---|
Step 6: Calculate Total Cost
Substitute \( x_{ij} \) into the objective function:
\[
\]
Snap & solve any problem in the app
Get step-by-step solutions on Sovi AI
Photo-based solutions with guided steps
Explore more problems and detailed explanations
The total distribution cost at the optimal solution is \(\boldsymbol{\$10,241}\) (rounded to the nearest dollar).